Inspection
of all equipment to check that erected facilities conform to construction
drawings and Contract
specifications.
|
·
|
Non-operating
field leak tests or field pressure tests on piping and field-fabricated
equipment as required by the Contract specifications, disposing
of test
media on site at a location specified by Owner, and removal of
test blinds
and restoring systems to “ready for operation”
condition.
|
·
|
Removal
of all temporary supports, bracing or other foreign
objects.
|
·
|
Inspection
of all columns to ensure proper installation of all
internals.
|
·
|
Field
inspection of all shop fabricated
equipment.
|
·
|
Line
flushing as part of hydrotesting.
|
·
|
Check
to ensure that all baseplates and soleplates are level and properly
grouted.
|
·
|
Check
pipe hangers, supports, guides and pipe specialties, and remove
all
shipping and erection bracing.
|
·
|
Check
alignment of all piping fit-up with equipment to avoid excessive
nozzle
loading and pipe stresses.
|
·
|
Insulation
for process purposes.
|
·
|
Install
Lubricants.
|
·
|
Check
rotating machinery for correct direction of rotation and for freedom
of
moving parts.
|
·
|
Check
cold alignments on rotating
equipment.
|
·
|
Schedule
the services of factory representatives for equipment or other
items as
required.
|
·
|
Electrical
and Instrumentation installed.
|
1.
|
an
initial payment of [*] of which [*] has been previously paid and
[*] which
shall be paid simultaneously with execution of this Contract if work
has
already begun on the Project. If work has not begun, the initial
payment
shall be due upon issuance of a Notice to proceed by owner to
Delta-T,
|
2.
|
monthly
installments of ninety-five percent (95%) of the remaining amount
in
accordance with the table set forth in Schedule F (the first such
payment
being paid on the thirtieth (30th)
day following the initial payment and the remaining payments being
paid on
the earlier of (i) the first day of each month following the date
of the
second payment, or (ii) upon Mechanical Completion,
and
|
3. |
The
final payment shall be paid upon Mechanical
Completion.
|
4.
|
If
Delta-T is behind by more than 30 days in any deliverables called
for by
Schedule C, then Owner may delay payment under this subparagraph
8.2(a)
until such time as Delta-T and Owner mutually agree on a new schedule.
Both parties shall cooperate in reaching agreement in this regard.
|
1.
|
Delta-T
shall provide Owner with three (3) business days’ notice of the need for
procurement funds. Included within such notice shall be a breakdown
of the
items to be ordered with the requested funds. Within three (3) business
days after receiving notice from Delta-T, Owner shall wire transfer
the
requested funds to Delta-T. DELTA-T shall hold such funds IN TRUST
for the
benefit of Owner until such time as the funds are remitted to a vendor
or
returned to Owner.
|
2.
|
The
cost of the procurement portion of the Work will become due and payable
as
the costs for equipment are committed by DELTA-T as
follows:
|
a.
|
Upon
placement of each purchase order, 10% of the total value of each
purchase
order, including markup is due and payable via wire transfer or zero
balance account.
|
b.
|
Upon
receipt of approval drawings, 20% of the total value of each purchase
order, including markup is due and payable via wire transfer or zero
balance account.
|
c.
|
Upon
receipt of materials at the vendor’s fabrication shop, 40% of the total
value of each purchase order, including markup is due and payable
via wire
transfer or zero balance account.
|
d.
|
Upon
delivery and acceptance at site, 25% of the total value of each purchase
order including markup is due and payable via wire transfer or zero
balance account.
|
e.
|
Upon
Mechanical Completion and the receipt of all vendor data and maintenance
manuals, 5% of the total value of each purchase order, including
markup is
due and payable via wire transfer or zero balance
account.
|
3.
|
Markup
shall be determined as set forth in Article 8.1.1(b).
|
a.
|
issuance
of any order of a court or other public authority having jurisdiction
instructing DELTA-T to permanently cease
Work;
|
b.
|
on
30 days notice if Owner has not made payment within thirty (30) days
of
the date due or a petition in bankruptcy is filed by or against it
and is
not dismissed within sixty (60) calendar days;
or
|
c.
|
Owner
commits a material breach of this Contract and fails to cure within
30
days of its receipt of written notice of such breach or such longer
time
as may be approved in writing by
DELTA-T.
|
If
to DELTA-T, to:
|
323
Alexander Lee Parkway
|
|
Williamsburg,
VA 23185
|
||
Attn:
Robert L. Swain
|
||
If
to Owner, to:
|
5711
N. West Avenue
|
|
Fresno,
California 93711
|
||
Attn:
Terry Kulesa
|
||
With
a copy to:
|
General
Counsel
|
DELTA-T CORPORATION | PEI Columbia, LLC | |||
By:
|
/S/
ROBERT L. SWAIN
|
By:
|
/S/
NEIL M. KOEHLER
|
|
Name:
|
Robert
L. Swain
|
Name:
|
Neil
M. Koehler
|
|
Printed
Name:
|
Robert
L. Swain
|
Printed
Name:
|
Neil
M. Koehler
|
|
Title:
|
Vice
President
|
Title:
|
CEO
|
|
Date:
|
9/6/06
|
Date:
|
9/6/06
|
1)
|
Scope
items and deliverables below designated by “ * ” will be reviewed and
signed off by OWNER per Section 3.2 of this Agreement before final
approval is given by OWNER to be implemented into the Project. These
items
include project issues and decisions that rely heavily on OWNER’S
discretion for financial, operating or strategic reasons. For example,
the
total amount of inventory and product storage capacity would need
OWNER’S
input as the decision has significant ramifications from a capital
cost
versus operating flexibility
standpoint.
|
2)
|
Per
Section 3.3 of this Agreement, scope items and deliverables below
designated by “ * ” require that DELTA-T, through DTPS, review the work
performed by OWNER’S general contractor(s), subcontractors or other agents
to make sure it is in compliance with Process
requirements.
|
3)
|
The
items designated “(C)” have been completed by DELTA-T, through DTPS, prior
to the date of execution of this
Agreement.
|
4)
|
The
items designated “(Basic Process Design”) are all the design and
engineering components provided by DELTA-T which are required to
complete
detailed engineering of the plant. A milestone will be defined in
the
Schedule setting forth a special “Basic Process Design review” for the
purpose of the Parties committing to all issues required to begin
the
detailed design of the Project. Once the Basic Process Design basis
has
been formally approved by both Parties and the data submitted to
detailed
engineering, any change requested by OWNER after that time will be
handled
as a change order with a reasonable extension of time and at a mutually
agreed price to perform the change.
|
5)
|
For
purposes of this Schedule A, “OWNER” shall include OWNER and all of
OWNER’s vendors and
subcontractors.
|
Task/Deliverable
Description
|
Responsibility
D
- Delta-T (DTPS)
O
- OWNER
|
Basic
Process Design
|
|
Detailed
Cost Budget, Plot Plan, Typical Project Schedule, Block Flow
Diagrams,
Building Information and Vendor Quotes from the existing
facility
(C).
|
D
|
NO
|
|
Engineering
SCHEDULE*
|
D
|
NO
|
|
Master
Project SCHEDULE **
|
O
|
NO
|
|
Engineering
Document List*
|
D
|
YES
|
|
System
Design Specifications*
|
D
|
YES
|
|
Process
Description
|
D
|
YES
|
|
Facility
Process Flow Diagram
|
D
|
NO
|
|
Facility
Mass and Energy Balances
|
D
|
YES
|
|
Process
Areas Flow Diagrams
|
D
|
YES
|
|
Process
Areas Mass and Energy Balances
|
D
|
YES
|
|
Production
& Utility Consumption*
|
D
|
YES
|
|
Piping
& Instrument Diagrams
|
D
|
YES
|
|
Major
Equipment List
|
D
|
YES
|
|
Major
Equipment Data Sheets
|
D
|
YES
|
|
Motor
List
|
D
|
YES
|
|
Instrument
List
|
D
|
YES
|
|
Valve
List
|
D
|
YES
|
|
Pipeline
List
|
D
|
YES
|
Insulation
& Heat Trace List
|
D
|
YES
|
|
Instrument
Data Sheets
|
D
|
YES
|
|
Major
Equipment Detailed Design
|
D
|
NO
|
|
PLANT
Process Equipment Procurement Technical Specifications
|
D
|
YES
|
|
Major
Equipment Bid Drawings
|
D
|
NO
|
|
Major
Equipment Bid Packages
|
D
|
NO
|
|
Non-PLANT
PROJECT Equipment Procurement Technical Specification
|
D
|
NO
|
|
Electrical
Single Line Diagram**
|
D
|
NO
|
Electrical
Arrangement Dwgs.**
|
D
|
NO
|
|
Electrical
Panel Design Drawings**
|
D
|
NO
|
|
Cable
and Conduit SCHEDULE
|
D
|
NO
|
|
Electrical
Interconnection Data
|
D
|
NO
|
|
Electrical
Schematic Diagrams**
|
D
|
NO
|
|
Control
Valve Data Sheets
|
D
|
YES
|
|
Manual
Valve Specifications
|
D
|
NO
|
|
Instrumentation
Installation Details
|
D
|
YES
|
|
Control
System Specification
|
D
|
YES
|
|
Control
Narrative
|
D
|
YES
|
|
Control
System Programming
|
D
|
NO
|
PLANT
Basic AutoCAD 3-D Equipment Arrangement & Piping Model
|
D
|
NO
|
|
PLANT
Equipment Plan & Section Arrangement Drawings
|
D
|
YES
|
|
PLANT
Basic Piping Layouts & Arrangement
|
D
|
YES
|
|
Instrumentation
Location Information
|
D
|
YES
|
|
Piping
Specifications
|
D
|
NO
|
|
Detailed
Piping Design & Arrangement
|
D
|
NO
|
|
Piping
Support Design
|
D
|
NO
|
|
Piping
Isometrics (IFB)
|
D
|
NO
|
|
Structural
Steel Arrangements**
|
D
|
NO
|
|
Structural
Steel Design
|
D
|
NO
|
|
Structural
Steel Fabrication & Installation Technical Specifications
|
D
|
NO
|
|
Foundation
Design
|
D
|
NO
|
|
Equipment
Installation Technical Specification
|
D
|
YES
|
|
Instrument
Installation Technical Specifications
|
D
|
YES
|
|
Insulation
Installation Technical Specification
|
D
|
YES
|
|
Piping
Installation Technical Specification
|
D
|
YES
|
|
Site
Geotechnical Data
|
O
|
NO
|
|
Building
Design**
|
D
|
NO
|
|
Rail
and Facility Design**
|
O
|
NO
|
|
Prepare
Environmental Permit Applications
|
O
|
NO
|
|
Process
Safety Management Review (PSM)**
|
D
|
NO
|
|
Verify
Compliance with Construction Codes
|
D
|
NO
|
Design
Fire Suppression System
|
O
|
NO
|
|
Supply
Process Needs Associated with Non Process Area Systems
|
D
|
YES
|
|
Review
of Detailed Engineering for Non-PLANT Areas
|
D
|
NO
|
|
Construction
Observation (with specific CLIENT approval of personnel)
|
D
|
NO
|
|
Operations
Manual
|
D
|
NO
|
|
Operator
Training*
|
O
|
NO
|
|
STARTUP
& Commissioning Assistance*
|
D
|
NO
|
|
Ongoing
Technical Service
|
D
|
NO
|
|
Bid
Evaluation & Equipment/Vendor Recommendation*
|
D
|
NO
|
|
Procurement
Services for Equipment listed in Section 1.13 below*
|
D
|
NO
|
|
Procurement
of construction materials, construction services, and equipment
other than
that listed in Section 1.13**
|
D
|
NO
|
· |
Grain
handling and storage
|
·
|
Detailed
piping design including layout, specifications and isometric
drawings
|
·
|
Instrumentation
and electrical installation
specifications
|
·
|
Specifications
for vessel detail design and installation, including
internals
|
·
|
3D
model reviews of piping, electrical and equipment
layout
|
·
|
Provide
electrical, structural, and process control design to support the
process.
|
·
|
Provide
bid packages for all major construction activities within DTC’s
scope.
|
·
|
Prepare
bid package supporting data and documentation, and prepare and issue
bid
packages to vendors
|
·
|
Evaluate
bids and vendor selections, subject to Owner’s
approval.
|
·
|
Issue
Purchase orders.
|
·
|
Track,
expedite and coordinate engineering drawings delivery as well as
equipment
deliveries to site
|
·
|
Review
and approve payment for all invoices for Equipment and
delivery.
|
·
|
Corn
receiving and storage systems
|
·
|
Review
of design for conformance with PROCESS
requirements
|
·
|
Assistance
with preparation of vendor lists and selection of
vendors
|
·
|
Assistance
with establishing scope for RFQ
|
·
|
Review
final design to ensure that it is compatible with the PROCESS and
the
PLANT
|
·
|
During
the construction phase, DELTA-T will provide a full time on-site
representative to interface with the construction contract and serve
as
the Delta-T (DTPC) representative.
|
·
|
Assist
OWNER with review of the entire PLANT for safety, operability, and
maintainability issues
|
·
|
Assist
OWNER with any required formal PSM review of selected areas of the
PLANT
|
·
|
Description
of the entire PLANT PROCESS and each system
operation
|
·
|
Detailed
operating description of each process
unit
|
·
|
Initial
start-up procedures
|
·
|
Normal
operation
|
·
|
Startup
& shutdown under normal operating
conditions
|
·
|
Startup
& shutdown under emergency
conditions
|
·
|
Cleaning
& preventive maintenance
guidelines
|
·
|
Safety
& Health guidelines
|
·
|
Basic
troubleshooting guides
|
·
|
Operations
manual, charts, diagrams
|
·
|
Classroom
instruction in the theory and background for system design &
operation
|
·
|
Instruction
in the PLANT consisting of "hands-on"
training
|
·
|
Startup
|
·
|
Normal
operation & control
|
·
|
Detection
of and reaction to abnormal operating
conditions
|
·
|
Cleaning
& preventive maintenance
guidelines
|
·
|
Planned
shutdown & startup
|
·
|
Emergency
shutdown & startup
|
·
|
Basic
troubleshooting
|
·
|
Safety
& Health guidelines
|
·
|
Provide
skilled and experienced engineering/operations personnel on site
with 24
hour per day coverage during critical commissioning activities, startup
and conductance of Acceptance Testing.
|
·
|
Provide
consultation and advice to troubleshoot and problem-solve startup
and
operating problems for all areas of the
PLANT
|
·
|
Continuance
of “hands-on” operator training while conducting startup and commissioning
activities
|
Applicable
Standards:
|
Federal,
State, Local, OSHA, Air quality, ANSI
|
Building
Codes:
|
UBC,
IBC, CBC, or other state, local, federal, or
international
building codes that may apply at
specified
site or sites
|
Cable
Marking:
|
ICEA
(Insulated Cable Engineers Association)
|
Concrete:
|
ACI
(American Concrete Institute)
|
Corrosion:
|
NACE
(National Association of Corrosion Engineers)
|
Electrical/Instrumentation:
|
NEMA
(National Electrical Manufacturers Assoc)
|
NEC
(National Electrical Code)
|
|
ISA
(Instrument Society of America)
|
|
Electrical
Components:
|
UL
(Underwriters Laboratories)
|
Flanges:
|
ANSI
standard
|
Fire
Protection:
|
NFPA,
IFC, CBC, or other state, local, federal, or
international
codes that may apply at specified
site
or sites
|
Heat
Exchanger:
|
TEMA
(Tubular Exchanger Manufacturers Association)
|
Nuts,
Bolts, Fittings
|
ASTM
(American Society of Testing Materials)
|
&
Line Components:
|
SAE
(Society of Automotive Engineers)
|
Painting:
|
SSPC
(Steel Structure Painting Council)
|
Personnel
Safety:
|
OSHA
(Occupational Safety and Health Association)
|
Piping,
pumps:
|
ANSI
(American National Standards Institute)
|
Structural
Steel:
|
AISC
(American Institute of Steel Construction)
|
Tanks
|
API
(American Petroleum Institute)
|
Valves
and Fittings:
|
MSS
(Manufacturers Standardization Society)
|
Vessels
(Where required):
|
ASME
(American Society of Mechanical Engineers)
|
Welding:
|
AWS
(American Welding Society)
|
DELTA-T
CORPORATE COMMERCIAL BILLING RATES
|
||
POSITION
/ FUNCTION
|
HOURLY
RATE
|
|
Senior
Consultant/Principal
|
$300.00
|
|
Director
of Engineering
|
$250.00
|
|
Project
Manager
|
$200.00
|
|
Construction
Manager
|
$150.00
|
|
Project
Engineer
|
$135.00
|
|
Project
Controls
|
$125.00
|
|
Procurement
Manager
|
$125.00
|
|
Senior
Process Consultant
|
$195.00
|
|
Senior
Process Engineer
|
$150.00
|
|
Senior
I&C Engineer
|
$150.00
|
|
Senior
Mechanical Engineer
|
$150.00
|
|
Process
Engineer
|
$125.00
|
|
I&C
Engineer
|
$110.00
|
|
Mechanical
Engineer
|
$110.00
|
|
Senior
Designer
|
$100.00
|
|
Designer
|
$75.00
|
|
Draftsperson
|
$60.00
|
|
Technicians
|
$110.00
|
|
Financial
Control and Billing
|
$80.00
|
|
Clerical
|
$60.00
|
4B
Components
East
Peoria, Illinois
|
Magnin-Interis
Charmes,
France
|
Abengoa
BioEnergy
Sevilla,
Spain
|
Katzen
International, Inc.
Cincinnati,
Ohio
|
Agrol
Biotechnologies Ltd.
Guildford,
Surrey Canada
|
Lurgi
PSI Inc.
Memphis,
TN
|
Ambitech
Engineering Corporation
Downers
Grove, Illinois
|
Merrick
& Company
Aurora,
Colorado
|
AMG
Engineering
Cincinnati,
Ohio
|
Praj
Industries
Pune,
India
|
Bio-Process
Innovation
West
Lafayette, Indiana
|
Process
Plus, LLC
Cincinnati,
Ohio
|
Bio-Renewable
Group
Omaha,
Nebraska
|
Raphael
Katzen Associates International
Cincinnati,
Ohio
|
Broin
& Associates, Inc.
Aberdeen,
South Dakota
|
Ro-Tech
Incorporated
Louisville,
Kentucky
|
Burns
& McDonnell
Kansas
City, Missouri
|
SNC-Lavalin
Group
Toronto,
Canada
|
Chematur
Engineering &
Weatherly
Engineering
Atlanta,
Georgia
|
Southeastern
Energy Development, Inc.
Brooklyn,
NY
(Alliance
with Pure Vision Technology)
|
Dick
Engineering Inc.
Toronto,
Ontario, Canada
|
Technip
Cedex,
France
|
MECS,
Inc.
St.
Louis, Missouri
|
Vogelbusch
USA, Inc.
Houston,
TX
(and
its parent Vogelbusch-Austria)
|
Fagen,
Inc.
Granite
Falls, Nebraska
|
Wave
Zeal Ltd.
Winnepeg,
Manitoba CANADA
|
Harris
Group Inc.
Seattle,
WA
|
Washington
Group International
Boise,
Idaho
|
ICM,
Inc.
Colwich,
KS
|
Washington
Group International
Boise,
Idaho
|
Any
individual, group or company that performs, on the date of the License
or
during its term, (a) consulting or engineering related to the design
of
alcohol process technology and/or (b) design/build services for existing
and prospective alcohol plants
|